Brand New Heated Floors

By May 12, 2014 Uncategorized No Comments

After removing 17,000 lbs of material during the demolition phase we have now put some of that weight back into the house with the concrete topper on our in-floor heating.  Above is a photo of the kitchen with the concrete now dry.  Everything is looking really good, and the floors are good and level for the first time in a long time.  

The kitchen island anchor bolts worked out really well and I think I saved myself a lot of work when I start the cabinet building:

 

 

Leave a Reply